Analisis Manajemen Konstruksi Jembatan Cisumengka Jalan Bebas Hambatan Cileunyi Sumedang Dawuan (Cisumdawu) Tahap III

  • Martinus Agus Sugiyanto Universitas Swadaya Gunung Jati
Keywords: Analysis, Construction Management, Bridge Construction.

Abstract

Construction management is the study and practice of managerial and technological aspects of the construction industry. Construction management can also be interpreted as one of the business capitals carried out by construction consultants in providing advice and assistance in a development project. The Construction Management Association of America “CMAA” states that there are seven main categories of responsibilities for a construction manager. These include project management planning, price management, time management, quality management, contract administration, safety management and professional practice. While the project is a combination of resources such as people, materials, equipment, and costs that are collected in a temporary organization place to achieve a goal and goal. So from the explanation above it can be concluded that project management is the application of knowledge, expertise and skills, the best technical way and with limited resources, to achieve the goals and objectives that have been determined in order to get optimal results in cost performance, quality. , and time, as well as work safety

References

F. N. Wowor, B. F. Sompie, D. R. O. Walangitan, and G. Y. Malingkas, “Aplikasi Microsoft Project dalam Pengendalian Waktu Pelaksanaan Pekerjaan Proyek,” J. Tek. Sipil, vol. 1, no. 8, pp. 543–548, 2013.

N. Kartika, S. M. Robial, and A. Pratama, “Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Kolom Di Proyek Pembangunan Gedung Pemda Kabupaten Sukabumi,” J. Momen Tek. Sipil, vol. 3, no. 2, p. 103, 2021, doi: 10.35194/momen.v3i2.1207.

A. Hardianto, “Analisa pengendalian manajemen waktu dan biaya proyek pembangunan hotel dengan network cpm studi kasus : batiqa hotel palembang,” Tek. Sipil dan Perenc., vol. 1, no. 1, pp. 1–17, 2015, [Online]. Available: http://eprints.ums.ac.id/37359/30/02. NASKAH PUBLIKASI.pdf.

E. R. M. Iwawo, J. Tjakra, and P. A. K. Pratasis, “Penerapan Metode Cpm Pada Proyek Konstruksi (Studi Kasus Pembangunan Gedung Baru Kompleks Eben Haezar Manado),” J. Sipil Statik, vol. 4, no. 9, 2016.

T. Awuy, P. A. K. Pratasis, and J. B. Mangare, “Faktor-faktor Penghambat Penerapan Sistem Manajemen K3 Pada Proyek Konstruksi Di Kota Manado,” J. Sipil Statik, vol. 5, no. 4, 2017.

S. Asnuddin, J. Tjakra, and M. Sibi, “Penerapan Manajemen Konstruksi Pada Tahap Controlling Proyek,” J. Sipil Statik Vol.6 No.11, vol. 6, no. 11, pp. 895–906, 2018.

M. Qomaruddin, Z. Rubiatin, T. H. Munawaroh, and ..., “Analisa Kerusakan Jembatan Bongpes Desa Gerdu Kabupaten Jepara,” J. …, vol. 6, no. 2, pp. 77–81, 2015.

A. Kustirini, M. Qomaruddin, D. S. Budiningrum, and I. E. Andammaliek, “The Influence Of Compressive Strength Of Mortar Geopolimer On Addition Of Carbit Waste Ash With Curing Oven System,” in Proceedings of the 1st International Conference on Civil Engineering, Electrical Engineering, Information Systems, Information Technology, and Agricultural Technology, 2020, pp. 1–4.

E. S. Ayu, “FAKTOR PENYEBAB PENINGKATAN BIAYA MATERIAL PADA PELAKSANAAN PROYEK KONSTRUKSI DI SUMATERA BARAT,” J. REKAYASA, vol. 7, no. 2 SE-Articles, Nov. 2019, [Online]. Available: https://jurnalrekayasa.bunghatta.ac.id/index.php/JRFTSP/article/view/17.

R. A. Nugroho et al., “Perencanaan Struktur Gedung 9 Lantai Hotel Sky Sea View Jepara,” J. Civ. Eng. Study, vol. 01, no. Dl, pp. 34–46, 2021.

D. A. Prasetyo, A. Anthony, H. P. Chandra, and S. Ratnawidjaja, “Analisis Produktivitas Tenaga Kerja Dengan Metode Work Sampling: Studi Kasus Proyek Tunjungan Plaza 6,” J. Dimens. Pratama Tek. Sipil, vol. 6, no. 1, 2017.

I. N. Barizqi, “Hubungan Antara Kepatuhan Penggunaan APD Dengan Kejadian Kecelakaan Kerja Pada Pekerja Bangunan PT. Adhi Karya TBK Proyek Rumah Sakit Telogorejo Semarang,” Skripsi, p. 2015, 2015.

widayat Widayat, H. Satriadi, L. P. Wibawa, G. F. Hanif, and M. Qomaruddin, “Oil and gas characteristics of coal with pyrolysis process Oil and Gas Characteristics of Coal with Pyrolysis Process,” 2022, vol. 020077, no. July.

Z. Umam, K., Hidayati, N., Saputro, Y. A., “KAJIAN SISTEM MANAJEMEN K3 DAN TINGKAT KECELAKAAN KERJA PADA PEKERJAAN STRUKTUR BAJA DI PLTU TANJUNG JATI B UNIT 5 & 6 JEPARA,” J. DISPROTEK Univ. Islam Nahdlatul Ulama Jepara, vol. 11, no. 2, pp. 93–101, 2020.

K. Nudja, “Perencanaan Kebutuhan dan Penjadwalan Sumber Daya pada Pelaksanaan Proyek Konstruksi,” Paduraksa, vol. 5, no. 2, pp. 13–23, 2016, doi: 10.22225/pd.5.2.375.13-23.

H. Manik, V. H. Puspasari, W. Nuswantoro, and A. Purwantoro, “Kunci Utama Pelaksanaan K3 Pada Proyek Pembangunan Gedung Muhammadiyah Palangka Raya Kampus II Di Saat Pandemi,” J. Civ. Eng. Study, vol. 1, pp. 1–5, 2021.

Published
2022-10-31