TIME CONTROL AND RESCHEDULING USING METHOD CPM (CRITICAL PATH METHOD)

Keywords: CPM (Critical Path Method), Drainase, Critical Path, Time Control

Abstract

In some development projects, finishing the work inside a restricted time is normal. This can never again be kept away from after the utilization of labor with is presently not equally. CPM (Critical Path Method) is a critical path the that intends to decide project arranging and time estimates that are deterministic/positive. Poin of investigation utilizing this method is to decide the time and cost of the undertaking and figure out what activities are remembered for the fundamental activities. Project arranging helps show the relationship of every development to various activities and normal assignments, recognizes which connections ought to come first among activities, and shows pragmatic time measures for each activity. Time control made no difference and the rescheduling results acquired for Development project the CPM (Critical Path Method) strategy were gotten in 300 days as per the underlying term of work.

References

[1] H. Susila and M. A. Azis, ‘KAJIAN PENERAPAN TIME MANAGEMENT PADA PELAKSANAAN PROYEK KONSTRUKSI GEDUNG DI KOTA SURAKARTA’, Teknik Sipil dan Arsitektur, vol. 14, no. 18, Dec. 2013.
[2] 2016 Handayani, ‘Analisis Pengendalian Biaya Proyek Pada Kontraktor Sedang (Grade 4 dan 5) di Yogyakarta’, e-Jurnal MATRIKS TEKNIK SIPIL, pp. 339–345, 2016.
[3] J. O. Simanjuntak et al., ‘Monitoring proyek berbasis indeks kinerja’, Jurnal Ilmiah Skylandsea, vol. 2, no. 1, pp. 11–17, 2018.
[4] Widiasanti Irika and Lenggogeni, Manajemen Konstruksi. 2013.
[5] Dhamayanti Rindra, Perencanaan Pengendalian Proyek Bangunan Gedung Dengan Menggunakan Work Breakdown Structure dan Kurva S. 2013.
[6] G. I. Sutopo and L. Hendarti, ‘Analisis Kurva S untuk Monitoring Pelaksanaan Proyek (Studi Kasus Proyek Rumah Tinggal di Jalan Cocak II nomer 3, Surakarta)’, SCER, vol. 2, no. 1, pp. 32–48, 2022.
[7] I. Agustiar and R. Handrianto, ‘EVALUASI PENJADWALAN PROYEK MENGGUNAKAN METODE CPM DAN KURVA S (Studi Kasus: Pembangunan Gedung Perpustakaan SMK N 1 “XX”, Gresik)’, Wahana Teknik, vol. 07, no. 02, pp. 99–105, 2018.
[8] R. Arifudin, ‘OPTIMASI PENJADWALAN PROYEK DENGAN PENYEIMBANGAN BIAYA MENGGUNAKAN KOMBINASI CPM DAN ALGORITMA GENETIKA’, Jurnal Masyarakat Informatika, vol. 2, no. 4, pp. 1–14, 2012.
[9] S. Qomariyah and F. Hamzah, ‘Analisis Network Planning Dengan CPM (Critical Path Method) Dalam Rangka Efisiensi Waktu Dan Biaya Proyek’, vol. 1, no. 4, pp. 408–416, 2013.
Published
2024-04-01